Nov 30, 2021 Lämna ett meddelande

CNPC Jiangsu LNG-terminal välkomnar sitt 500:e LNG-fartyg

On November 28, the "Allen" LNG carrier berthed at the CNPC Jiangsu LNG Terminal. This is the 500th LNG ship unloaded at the terminal. The 164,000 cubic meters of LNG sent by "Allen" this time can be gasified to transport 100 million cubic meters of gaseous natural gas for use by residents in the Yangtze River Delta for two and a half days in winter.

Skicka förfrågan

whatsapp

Telefon

E-post

Förfrågning